Combined Cycle Repair

It’s all about execution. Our combine cycle repair team always has your best interest in mind.

The key to reliable operation of any power equipment is a successful maintenance plan. This helps your maintenance managers plan ahead, minimize unexpected failures, and accommodate limitations imposed by financial and outage resources. We approach your combined cycle repair project with the urgency it deserves taking into consideration cost, outage time and contractor manpower.

Our on call boiler repair teams are available 24 hours a day and can be on-site within hours of your initial phone call. We include everything you need to get your boiler operational as quickly as possible.

Our Services include

Door Installation

Tube Welding

Maintenance

Liner Replacement

Piping

This is important when you take into account the fact that hundreds of F-class or larger HRSGs were commissioned in the 2000-to-2005 time period. This means many are about half-way through their original specified design life.

Factor in the sharp increase in plants conducting HRSG cycling, and many of these HRSGs can expect to need major component redesigns and replacements in the next ten years. That means combined cycle power plants will need more focus and coordination over the next few years than they did in the previous ten to identify and plan for the likelihood of major HRSG capital projects.

There are several large HRSG projects that managers of combined cycle plants should assess thoroughly and include in any forecasts being done as part of maintenance planning.

Combined Cycle Repair
Combined Cycle Repair
E

LOAD BURNER & BAFFLE REPLACEMENT

E

HRSG GAS BAFFLE INSTALLATION

E

LOAD BURNER & BAFFLE REPLACEMENT

E

INNER LINER PANEL REPAIRS/ REPLACEMENT

E

HRSG GAS BAFFLE INSTALLATION

E

PIPING INSTALLATION & REPAIRS

E

HRSG OUTER CASING REPAIRS

E

CO CATALYST REMOVAL & INSTALLATION

E

LP, IP, &HP DRUM REPAIRS

E

HRSG DOOR REPAIRS/ REPLACEMENT

E

HRSG DOOR REPAIRS/ REPLACEMENT

E

EXPANSION JOINT REPAIRS/ REPLACEMENT

E

EXPANSION JOINT REPAIRS/ REPLACEMENT

E

EXAHST STACK REPAIRS

E

ASME "S" STAMP &NBIC "R' STAMP HOLDER

E

DRUM DOOR REPLACEMENT

E

LOAD BURNER & BAFFLE REPLACEMENT

E

HRSG TUBE REPAIRS

E

DA TANK TRAY REMOVAL & REPLACEMENT

E

HRSG INNER FIELD SEAM MODIFICATIONS

E

INSULATION WORK

E

EPRI CERTIFIED & QUALIFIED RIGGERS

E

SST SAFETY LEADERSHIP TRAINED SUPERVISION

Our Work

IMTEC Door Installation

IMTEC HRSG Door Installation

zeeka burner installation in a Nooter triple wide

hrsg liner plate replacement